Democratic Republic of Congo vs Ghana: Dealing with construction: Quality control during
Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Ghana
2 DB16-20 methodology
in 2019
Democratic Republic of Congo rank
20th
Ghana rank
20th
Dealing with construction: Quality control during over time
- Democratic Republic of Congo
- Ghana
How they compare
Democratic Republic of Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Ghana, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Ghana has been ahead every year.
Democratic Republic of Congo ranks 20th and Ghana ranks 20th of 186 countries.
Ghana has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Democratic Republic of Congo or Ghana?
- Democratic Republic of Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Ghana as of 2019.
- What is the difference in dealing with construction permits: quality control during between Democratic Republic of Congo and Ghana?
- 0 DB16-20 methodology, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Ghana?
- 6 years are reported by both, from 2014 to 2019.
- How do Democratic Republic of Congo and Ghana rank globally for dealing with construction permits: quality control during?
- Democratic Republic of Congo ranks 20th and Ghana ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.