Democratic Republic of Congo vs Morocco: Dealing with construction permits: Quality control during construction
Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Morocco
2 DB16-20 methodology
in 2019
Democratic Republic of Congo rank
19th
Morocco rank
19th
Dealing with construction permits: Quality control during construction over time
- Democratic Republic of Congo
- Morocco
How they compare
Democratic Republic of Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Morocco, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Morocco has been ahead every year.
Democratic Republic of Congo ranks 19th and Morocco ranks 19th of 183 countries.
Morocco has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Democratic Republic of Congo or Morocco?
- Democratic Republic of Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Morocco as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Democratic Republic of Congo and Morocco?
- 0 DB16-20 methodology, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Morocco?
- 6 years are reported by both, from 2014 to 2019.
- How do Democratic Republic of Congo and Morocco rank globally for dealing with construction permits: quality control during construction?
- Democratic Republic of Congo ranks 19th and Morocco ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.