Congo, Democratic Republic of the vs Slovakia: Dealing with construction permits: Quality control during
Congo, Democratic Republic of the
2 DB16-20 methodology
in 2019
Slovakia
2 DB16-20 methodology
in 2019
Congo, Democratic Republic of the rank
20th
Slovakia rank
20th
Dealing with construction permits: Quality control during over time
- Congo, Democratic Republic of the
- Slovakia
How they compare
Congo, Democratic Republic of the currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Slovakia has been ahead every year.
Congo, Democratic Republic of the ranks 20th and Slovakia ranks 20th of 185 countries.
Slovakia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Congo, Democratic Republic of the or Slovakia?
- Congo, Democratic Republic of the, at 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Congo, Democratic Republic of the and Slovakia?
- 0 DB16-20 methodology, with Congo, Democratic Republic of the ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Slovakia?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo, Democratic Republic of the and Slovakia rank globally for dealing with construction permits: quality control during?
- Congo, Democratic Republic of the ranks 20th and Slovakia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.