Congo vs Nigeria: Dealing with construction permits: Quality control during construction
Congo
2 DB16-20 methodology
in 2019
Nigeria
2 DB16-20 methodology
in 2019
Congo rank
19th
Nigeria rank
19th
Dealing with construction permits: Quality control during construction over time
- Congo
- Nigeria
How they compare
Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Nigeria, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Nigeria has been ahead every year.
Congo ranks 19th and Nigeria ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Congo or Nigeria?
- Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Nigeria as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Congo and Nigeria?
- 0 DB16-20 methodology, with Congo ahead.
- How many years of comparable data are there for Congo and Nigeria?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Nigeria rank globally for dealing with construction permits: quality control during construction?
- Congo ranks 19th and Nigeria ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.