Congo vs Palau: Dealing with construction permits: Quality control during construction

Congo
2 DB16-20 methodology
in 2019
Palau
2 DB16-20 methodology
in 2019
Congo rank
19th
Palau rank
19th

Dealing with construction permits: Quality control during construction over time

  • Congo
  • Palau
00.511.52201420162019

How they compare

Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Palau, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Palau has been ahead every year.

Congo ranks 19th and Palau ranks 19th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Congo or Palau?
Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Palau as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Congo and Palau?
0 DB16-20 methodology, with Congo ahead.
How many years of comparable data are there for Congo and Palau?
6 years are reported by both, from 2014 to 2019.
How do Congo and Palau rank globally for dealing with construction permits: quality control during construction?
Congo ranks 19th and Palau ranks 19th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.