Congo vs Serbia: Dealing with construction permits: Quality control during
Congo
2 DB16-20 methodology
in 2019
Serbia
2 DB16-20 methodology
in 2019
Congo rank
20th
Serbia rank
20th
Dealing with construction permits: Quality control during over time
- Congo
- Serbia
How they compare
Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Serbia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Serbia has been ahead every year.
Congo ranks 20th and Serbia ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Congo or Serbia?
- Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Serbia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Congo and Serbia?
- 0 DB16-20 methodology, with Congo ahead.
- How many years of comparable data are there for Congo and Serbia?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Serbia rank globally for dealing with construction permits: quality control during?
- Congo ranks 20th and Serbia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.