Congo vs Taiwan: Dealing with construction permits: Quality control during construction
Congo
2 DB16-20 methodology
in 2019
Taiwan
2 DB16-20 methodology
in 2019
Congo rank
19th
Taiwan rank
19th
Dealing with construction permits: Quality control during construction over time
- Congo
- Taiwan
How they compare
Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Taiwan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Taiwan has been ahead every year.
Congo ranks 19th and Taiwan ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Congo or Taiwan?
- Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Taiwan as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Congo and Taiwan?
- 0 DB16-20 methodology, with Congo ahead.
- How many years of comparable data are there for Congo and Taiwan?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Taiwan rank globally for dealing with construction permits: quality control during construction?
- Congo ranks 19th and Taiwan ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.