Congo vs Thailand: Dealing with construction permits: Quality control during construction
Congo
2 DB16-20 methodology
in 2019
Thailand
2 DB16-20 methodology
in 2019
Congo rank
19th
Thailand rank
19th
Dealing with construction permits: Quality control during construction over time
- Congo
- Thailand
How they compare
Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Thailand has been ahead every year.
Congo ranks 19th and Thailand ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Congo or Thailand?
- Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Thailand as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Congo and Thailand?
- 0 DB16-20 methodology, with Congo ahead.
- How many years of comparable data are there for Congo and Thailand?
- 6 years are reported by both, from 2014 to 2019.
- How do Congo and Thailand rank globally for dealing with construction permits: quality control during construction?
- Congo ranks 19th and Thailand ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.