Congo vs Viet Nam: Dealing with construction permits: Quality control during

Congo
2 DB16-20 methodology
in 2019
Viet Nam
2 DB16-20 methodology
in 2019
Congo rank
20th
Viet Nam rank
20th

Dealing with construction permits: Quality control during over time

  • Congo
  • Viet Nam
00.511.52201420162019

How they compare

Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Viet Nam, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Viet Nam has been ahead every year.

Congo ranks 20th and Viet Nam ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Congo or Viet Nam?
Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Viet Nam as of 2019.
What is the difference in dealing with construction permits: quality control during between Congo and Viet Nam?
0 DB16-20 methodology, with Congo ahead.
How many years of comparable data are there for Congo and Viet Nam?
6 years are reported by both, from 2014 to 2019.
How do Congo and Viet Nam rank globally for dealing with construction permits: quality control during?
Congo ranks 20th and Viet Nam ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Viet Nam: Dealing with construction permits: Quality control during. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/congo-rep/viet-nam/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/congo-rep/viet-nam/">Congo vs Viet Nam: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.