Costa Rica vs India: Dealing with construction permits: Quality control during

Costa Rica
2 DB16-20 methodology
in 2019
India
2.53 DB16-20 methodology
in 2019
Costa Rica rank
20th
India rank
19th

Dealing with construction permits: Quality control during over time

  • Costa Rica
  • India
0123201420162019

How they compare

India currently reports 2.53 DB16-20 methodology against 2 DB16-20 methodology in Costa Rica, a difference of 0.53 DB16-20 methodology.

That makes India's figure about 1.3 times Costa Rica's.

Across all 6 years both countries report, India has been ahead every year.

Costa Rica ranks 20th and India ranks 19th of 186 countries.

India has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Costa Rica or India?
India, at 2.53 DB16-20 methodology against 2 DB16-20 methodology in Costa Rica as of 2019.
What is the difference in dealing with construction permits: quality control during between Costa Rica and India?
0.53 DB16-20 methodology, with India ahead.
How many years of comparable data are there for Costa Rica and India?
6 years are reported by both, from 2014 to 2019.
How do Costa Rica and India rank globally for dealing with construction permits: quality control during?
Costa Rica ranks 20th and India ranks 19th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Costa Rica vs India: Dealing with construction permits: Quality control during. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/costa-rica/india/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/costa-rica/india/">Costa Rica vs India: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.