Costa Rica vs Malta: Dealing with construction permits: Quality control during
Costa Rica
2 DB16-20 methodology
in 2019
Malta
2 DB16-20 methodology
in 2019
Costa Rica rank
20th
Malta rank
20th
Dealing with construction permits: Quality control during over time
- Costa Rica
- Malta
How they compare
Costa Rica currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Malta, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Malta has been ahead every year.
Costa Rica ranks 20th and Malta ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Costa Rica or Malta?
- Costa Rica, at 2 DB16-20 methodology against 2 DB16-20 methodology in Malta as of 2019.
- What is the difference in dealing with construction permits: quality control during between Costa Rica and Malta?
- 0 DB16-20 methodology, with Costa Rica ahead.
- How many years of comparable data are there for Costa Rica and Malta?
- 6 years are reported by both, from 2014 to 2019.
- How do Costa Rica and Malta rank globally for dealing with construction permits: quality control during?
- Costa Rica ranks 20th and Malta ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.