Costa Rica vs Puerto Rico: Dealing with construction permits: Quality control during

Costa Rica
2 DB16-20 methodology
in 2019
Puerto Rico
2 DB16-20 methodology
in 2019
Costa Rica rank
20th
Puerto Rico rank
20th

Dealing with construction permits: Quality control during over time

  • Costa Rica
  • Puerto Rico
00.511.52201420162019

How they compare

Costa Rica currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Puerto Rico, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Puerto Rico has been ahead every year.

Costa Rica ranks 20th and Puerto Rico ranks 20th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Costa Rica or Puerto Rico?
Costa Rica, at 2 DB16-20 methodology against 2 DB16-20 methodology in Puerto Rico as of 2019.
What is the difference in dealing with construction permits: quality control during between Costa Rica and Puerto Rico?
0 DB16-20 methodology, with Costa Rica ahead.
How many years of comparable data are there for Costa Rica and Puerto Rico?
6 years are reported by both, from 2014 to 2019.
How do Costa Rica and Puerto Rico rank globally for dealing with construction permits: quality control during?
Costa Rica ranks 20th and Puerto Rico ranks 20th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Costa Rica vs Puerto Rico: Dealing with construction permits: Quality control during. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/costa-rica/puerto-rico-us/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/costa-rica/puerto-rico-us/">Costa Rica vs Puerto Rico: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.