Côte d'Ivoire vs Spain: Dealing with construction permits: Quality control during
Côte d'Ivoire
2 DB16-20 methodology
in 2019
Spain
2 DB16-20 methodology
in 2019
Côte d'Ivoire rank
20th
Spain rank
20th
Dealing with construction permits: Quality control during over time
- Côte d'Ivoire
- Spain
How they compare
Côte d'Ivoire currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Spain has been ahead every year.
Côte d'Ivoire ranks 20th and Spain ranks 20th of 185 countries.
Spain has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Côte d'Ivoire or Spain?
- Côte d'Ivoire, at 2 DB16-20 methodology against 2 DB16-20 methodology in Spain as of 2019.
- What is the difference in dealing with construction permits: quality control during between Côte d'Ivoire and Spain?
- 0 DB16-20 methodology, with Côte d'Ivoire ahead.
- How many years of comparable data are there for Côte d'Ivoire and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Côte d'Ivoire and Spain rank globally for dealing with construction permits: quality control during?
- Côte d'Ivoire ranks 20th and Spain ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.