Cyprus vs Myanmar: Dealing with construction permits: Quality control during construction

Cyprus
2 DB16-20 methodology
in 2019
Myanmar
2 DB16-20 methodology
in 2019
Cyprus rank
19th
Myanmar rank
19th

Dealing with construction permits: Quality control during construction over time

  • Cyprus
  • Myanmar
00.511.52201420162019

How they compare

Cyprus currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Myanmar, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Myanmar has been ahead every year.

Cyprus ranks 19th and Myanmar ranks 19th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Cyprus or Myanmar?
Cyprus, at 2 DB16-20 methodology against 2 DB16-20 methodology in Myanmar as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Cyprus and Myanmar?
0 DB16-20 methodology, with Cyprus ahead.
How many years of comparable data are there for Cyprus and Myanmar?
6 years are reported by both, from 2014 to 2019.
How do Cyprus and Myanmar rank globally for dealing with construction permits: quality control during construction?
Cyprus ranks 19th and Myanmar ranks 19th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cyprus vs Myanmar: Dealing with construction permits: Quality control during construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/cyprus/myanmar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/cyprus/myanmar/">Cyprus vs Myanmar: Dealing with construction permits: Quality control during construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.