Czech Republic vs Uruguay: Dealing with construction permits: Quality control during
Czech Republic
2 DB16-20 methodology
in 2019
Uruguay
2 DB16-20 methodology
in 2019
Czech Republic rank
20th
Uruguay rank
20th
Dealing with construction permits: Quality control during over time
- Czech Republic
- Uruguay
How they compare
Czech Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Uruguay, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Uruguay has been ahead every year.
Czech Republic ranks 20th and Uruguay ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Czech Republic or Uruguay?
- Czech Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in Uruguay as of 2019.
- What is the difference in dealing with construction permits: quality control during between Czech Republic and Uruguay?
- 0 DB16-20 methodology, with Czech Republic ahead.
- How many years of comparable data are there for Czech Republic and Uruguay?
- 6 years are reported by both, from 2014 to 2019.
- How do Czech Republic and Uruguay rank globally for dealing with construction permits: quality control during?
- Czech Republic ranks 20th and Uruguay ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.