Dominican Republic vs Jamaica: Dealing with construction permits: Quality control during
Dominican Republic
2 DB16-20 methodology
in 2019
Jamaica
2 DB16-20 methodology
in 2019
Dominican Republic rank
20th
Jamaica rank
20th
Dealing with construction permits: Quality control during over time
- Dominican Republic
- Jamaica
How they compare
Dominican Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Jamaica, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Jamaica has been ahead every year.
Dominican Republic ranks 20th and Jamaica ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Dominican Republic or Jamaica?
- Dominican Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in Jamaica as of 2019.
- What is the difference in dealing with construction permits: quality control during between Dominican Republic and Jamaica?
- 0 DB16-20 methodology, with Dominican Republic ahead.
- How many years of comparable data are there for Dominican Republic and Jamaica?
- 6 years are reported by both, from 2014 to 2019.
- How do Dominican Republic and Jamaica rank globally for dealing with construction permits: quality control during?
- Dominican Republic ranks 20th and Jamaica ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.