Dominican Republic vs Oman: Dealing with construction permits: Quality control during
Dominican Republic
2 DB16-20 methodology
in 2019
Oman
2 DB16-20 methodology
in 2019
Dominican Republic rank
20th
Oman rank
20th
Dealing with construction permits: Quality control during over time
- Dominican Republic
- Oman
How they compare
Dominican Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Oman, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Oman has been ahead every year.
Dominican Republic ranks 20th and Oman ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Dominican Republic or Oman?
- Dominican Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in Oman as of 2019.
- What is the difference in dealing with construction permits: quality control during between Dominican Republic and Oman?
- 0 DB16-20 methodology, with Dominican Republic ahead.
- How many years of comparable data are there for Dominican Republic and Oman?
- 6 years are reported by both, from 2014 to 2019.
- How do Dominican Republic and Oman rank globally for dealing with construction permits: quality control during?
- Dominican Republic ranks 20th and Oman ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.