Dominican Republic vs United States of America: Dealing with construction permits: Quality control during
Dominican Republic
2 DB16-20 methodology
in 2019
United States of America
2 DB16-20 methodology
in 2019
Dominican Republic rank
20th
United States of America rank
20th
Dealing with construction permits: Quality control during over time
- Dominican Republic
- United States of America
How they compare
Dominican Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in United States of America, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, United States of America has been ahead every year.
Dominican Republic ranks 20th and United States of America ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Dominican Republic or United States of America?
- Dominican Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in United States of America as of 2019.
- What is the difference in dealing with construction permits: quality control during between Dominican Republic and United States of America?
- 0 DB16-20 methodology, with Dominican Republic ahead.
- How many years of comparable data are there for Dominican Republic and United States of America?
- 6 years are reported by both, from 2014 to 2019.
- How do Dominican Republic and United States of America rank globally for dealing with construction permits: quality control during?
- Dominican Republic ranks 20th and United States of America ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.