Ecuador vs Panama: Dealing with construction permits: Quality control during
Ecuador
0 DB16-20 methodology
in 2019
Panama
0 DB16-20 methodology
in 2019
Ecuador rank
159th
Panama rank
159th
Dealing with construction permits: Quality control during over time
- Ecuador
- Panama
How they compare
Ecuador currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Panama, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Panama has been ahead every year.
Ecuador ranks 159th and Panama ranks 159th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Ecuador or Panama?
- Ecuador, at 0 DB16-20 methodology against 0 DB16-20 methodology in Panama as of 2019.
- What is the difference in dealing with construction permits: quality control during between Ecuador and Panama?
- 0 DB16-20 methodology, with Ecuador ahead.
- How many years of comparable data are there for Ecuador and Panama?
- 6 years are reported by both, from 2014 to 2019.
- How do Ecuador and Panama rank globally for dealing with construction permits: quality control during?
- Ecuador ranks 159th and Panama ranks 159th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.