Germany vs Japan: Dealing with construction permits: Quality control during
Germany
2 DB16-20 methodology
in 2019
Japan
2 DB16-20 methodology
in 2019
Germany rank
20th
Japan rank
20th
Dealing with construction permits: Quality control during over time
- Germany
- Japan
How they compare
Germany currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Japan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Japan has been ahead every year.
Germany ranks 20th and Japan ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Germany or Japan?
- Germany, at 2 DB16-20 methodology against 2 DB16-20 methodology in Japan as of 2019.
- What is the difference in dealing with construction permits: quality control during between Germany and Japan?
- 0 DB16-20 methodology, with Germany ahead.
- How many years of comparable data are there for Germany and Japan?
- 6 years are reported by both, from 2014 to 2019.
- How do Germany and Japan rank globally for dealing with construction permits: quality control during?
- Germany ranks 20th and Japan ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.