Germany vs Palau: Dealing with construction permits: Quality control during

Germany
2 DB16-20 methodology
in 2019
Palau
2 DB16-20 methodology
in 2019
Germany rank
20th
Palau rank
20th

Dealing with construction permits: Quality control during over time

  • Germany
  • Palau
00.511.52201420162019

How they compare

Germany currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Palau, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Palau has been ahead every year.

Germany ranks 20th and Palau ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Germany or Palau?
Germany, at 2 DB16-20 methodology against 2 DB16-20 methodology in Palau as of 2019.
What is the difference in dealing with construction permits: quality control during between Germany and Palau?
0 DB16-20 methodology, with Germany ahead.
How many years of comparable data are there for Germany and Palau?
6 years are reported by both, from 2014 to 2019.
How do Germany and Palau rank globally for dealing with construction permits: quality control during?
Germany ranks 20th and Palau ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Germany vs Palau: Dealing with construction permits: Quality control during. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/germany/palau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/germany/palau/">Germany vs Palau: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.