Guinea vs Tanzania, United Republic of: Dealing with construction permits: Quality control during

Guinea
2 DB16-20 methodology
in 2019
Tanzania, United Republic of
2 DB16-20 methodology
in 2019
Guinea rank
20th
Tanzania, United Republic of rank
20th

Dealing with construction permits: Quality control during over time

  • Guinea
  • Tanzania, United Republic of
00.511.52201420162019

How they compare

Guinea currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Tanzania, United Republic of, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Tanzania, United Republic of has been ahead every year.

Guinea ranks 20th and Tanzania, United Republic of ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Guinea or Tanzania, United Republic of?
Guinea, at 2 DB16-20 methodology against 2 DB16-20 methodology in Tanzania, United Republic of as of 2019.
What is the difference in dealing with construction permits: quality control during between Guinea and Tanzania, United Republic of?
0 DB16-20 methodology, with Guinea ahead.
How many years of comparable data are there for Guinea and Tanzania, United Republic of?
6 years are reported by both, from 2014 to 2019.
How do Guinea and Tanzania, United Republic of rank globally for dealing with construction permits: quality control during?
Guinea ranks 20th and Tanzania, United Republic of ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guinea vs Tanzania, United Republic of: Dealing with construction permits: Quality control during. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/guinea/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/guinea/tanzania/">Guinea vs Tanzania, United Republic of: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.