Hungary vs Portugal: Dealing with construction permits: Quality control during
Hungary
2 DB16-20 methodology
in 2019
Portugal
2 DB16-20 methodology
in 2019
Hungary rank
20th
Portugal rank
20th
Dealing with construction permits: Quality control during over time
- Hungary
- Portugal
How they compare
Hungary currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Portugal, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Portugal has been ahead every year.
Hungary ranks 20th and Portugal ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Hungary or Portugal?
- Hungary, at 2 DB16-20 methodology against 2 DB16-20 methodology in Portugal as of 2019.
- What is the difference in dealing with construction permits: quality control during between Hungary and Portugal?
- 0 DB16-20 methodology, with Hungary ahead.
- How many years of comparable data are there for Hungary and Portugal?
- 6 years are reported by both, from 2014 to 2019.
- How do Hungary and Portugal rank globally for dealing with construction permits: quality control during?
- Hungary ranks 20th and Portugal ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.