India vs Morocco: Dealing with construction permits: Quality control during construction

India
2.53 DB16-20 methodology
in 2019
Morocco
2 DB16-20 methodology
in 2019
India rank
18th
Morocco rank
19th

Dealing with construction permits: Quality control during construction over time

  • India
  • Morocco
0123201420162019

How they compare

India currently reports 2.53 DB16-20 methodology against 2 DB16-20 methodology in Morocco, a difference of 0.53 DB16-20 methodology.

That makes India's figure about 1.3 times Morocco's.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Morocco ahead.

India ranks 18th and Morocco ranks 19th of 183 countries.

India has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, India or Morocco?
India, at 2.53 DB16-20 methodology against 2 DB16-20 methodology in Morocco as of 2019.
What is the difference in dealing with construction permits: quality control during construction between India and Morocco?
0.53 DB16-20 methodology, with India ahead.
How many years of comparable data are there for India and Morocco?
6 years are reported by both, from 2014 to 2019.
How do India and Morocco rank globally for dealing with construction permits: quality control during construction?
India ranks 18th and Morocco ranks 19th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

India vs Morocco: Dealing with construction permits: Quality control during construction. Statizoid. Retrieved 16 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/india/morocco/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/india/morocco/">India vs Morocco: Dealing with construction permits: Quality control during construction</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.