Indonesia vs Chinese Taipei: Dealing with construction permits: Quality control during
Indonesia
2 DB16-20 methodology
in 2019
Chinese Taipei
2 DB16-20 methodology
in 2019
Indonesia rank
20th
Chinese Taipei rank
20th
Dealing with construction permits: Quality control during over time
- Indonesia
- Chinese Taipei
How they compare
Indonesia currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Chinese Taipei, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Chinese Taipei has been ahead every year.
Indonesia ranks 20th and Chinese Taipei ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Indonesia or Chinese Taipei?
- Indonesia, at 2 DB16-20 methodology against 2 DB16-20 methodology in Chinese Taipei as of 2019.
- What is the difference in dealing with construction permits: quality control during between Indonesia and Chinese Taipei?
- 0 DB16-20 methodology, with Indonesia ahead.
- How many years of comparable data are there for Indonesia and Chinese Taipei?
- 6 years are reported by both, from 2014 to 2019.
- How do Indonesia and Chinese Taipei rank globally for dealing with construction permits: quality control during?
- Indonesia ranks 20th and Chinese Taipei ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.