Japan vs Tajikistan: Dealing with construction permits: Quality control during
Japan
2 DB16-20 methodology
in 2019
Tajikistan
2 DB16-20 methodology
in 2019
Japan rank
20th
Tajikistan rank
20th
Dealing with construction permits: Quality control during over time
- Japan
- Tajikistan
How they compare
Japan currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Tajikistan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tajikistan has been ahead every year.
Japan ranks 20th and Tajikistan ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Japan or Tajikistan?
- Japan, at 2 DB16-20 methodology against 2 DB16-20 methodology in Tajikistan as of 2019.
- What is the difference in dealing with construction permits: quality control during between Japan and Tajikistan?
- 0 DB16-20 methodology, with Japan ahead.
- How many years of comparable data are there for Japan and Tajikistan?
- 6 years are reported by both, from 2014 to 2019.
- How do Japan and Tajikistan rank globally for dealing with construction permits: quality control during?
- Japan ranks 20th and Tajikistan ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.