Jordan vs Mexico: Dealing with construction permits: Quality control during
Jordan
2 DB16-20 methodology
in 2019
Mexico
2 DB16-20 methodology
in 2019
Jordan rank
20th
Mexico rank
20th
Dealing with construction permits: Quality control during over time
- Jordan
- Mexico
How they compare
Jordan currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Mexico, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Mexico has been ahead every year.
Jordan ranks 20th and Mexico ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Jordan or Mexico?
- Jordan, at 2 DB16-20 methodology against 2 DB16-20 methodology in Mexico as of 2019.
- What is the difference in dealing with construction permits: quality control during between Jordan and Mexico?
- 0 DB16-20 methodology, with Jordan ahead.
- How many years of comparable data are there for Jordan and Mexico?
- 6 years are reported by both, from 2014 to 2019.
- How do Jordan and Mexico rank globally for dealing with construction permits: quality control during?
- Jordan ranks 20th and Mexico ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.