South Korea vs Namibia: Dealing with construction permits: Quality control during construction
South Korea
2 DB16-20 methodology
in 2019
Namibia
2 DB16-20 methodology
in 2019
South Korea rank
19th
Namibia rank
19th
Dealing with construction permits: Quality control during construction over time
- South Korea
- Namibia
How they compare
South Korea currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Namibia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Namibia has been ahead every year.
South Korea ranks 19th and Namibia ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, South Korea or Namibia?
- South Korea, at 2 DB16-20 methodology against 2 DB16-20 methodology in Namibia as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between South Korea and Namibia?
- 0 DB16-20 methodology, with South Korea ahead.
- How many years of comparable data are there for South Korea and Namibia?
- 6 years are reported by both, from 2014 to 2019.
- How do South Korea and Namibia rank globally for dealing with construction permits: quality control during construction?
- South Korea ranks 19th and Namibia ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.