Republic of Korea vs Slovakia: Dealing with construction permits: Quality control during

Republic of Korea
2 DB16-20 methodology
in 2019
Slovakia
2 DB16-20 methodology
in 2019
Republic of Korea rank
20th
Slovakia rank
20th

Dealing with construction permits: Quality control during over time

  • Republic of Korea
  • Slovakia
00.511.52201420162019

How they compare

Republic of Korea currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Slovakia has been ahead every year.

Republic of Korea ranks 20th and Slovakia ranks 20th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Republic of Korea or Slovakia?
Republic of Korea, at 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia as of 2019.
What is the difference in dealing with construction permits: quality control during between Republic of Korea and Slovakia?
0 DB16-20 methodology, with Republic of Korea ahead.
How many years of comparable data are there for Republic of Korea and Slovakia?
6 years are reported by both, from 2014 to 2019.
How do Republic of Korea and Slovakia rank globally for dealing with construction permits: quality control during?
Republic of Korea ranks 20th and Slovakia ranks 20th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Republic of Korea vs Slovakia: Dealing with construction permits: Quality control during. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/korea-rep/slovak-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/korea-rep/slovak-republic/">Republic of Korea vs Slovakia: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.