Republic of Korea vs Palestine, State of: Dealing with construction permits: Quality control during

Republic of Korea
2 DB16-20 methodology
in 2019
Palestine, State of
2 DB16-20 methodology
in 2019
Republic of Korea rank
20th
Palestine, State of rank
20th

Dealing with construction permits: Quality control during over time

  • Republic of Korea
  • Palestine, State of
00.511.52201420162019

How they compare

Republic of Korea currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Palestine, State of, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Palestine, State of has been ahead every year.

Republic of Korea ranks 20th and Palestine, State of ranks 20th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Republic of Korea or Palestine, State of?
Republic of Korea, at 2 DB16-20 methodology against 2 DB16-20 methodology in Palestine, State of as of 2019.
What is the difference in dealing with construction permits: quality control during between Republic of Korea and Palestine, State of?
0 DB16-20 methodology, with Republic of Korea ahead.
How many years of comparable data are there for Republic of Korea and Palestine, State of?
6 years are reported by both, from 2014 to 2019.
How do Republic of Korea and Palestine, State of rank globally for dealing with construction permits: quality control during?
Republic of Korea ranks 20th and Palestine, State of ranks 20th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Republic of Korea vs Palestine, State of: Dealing with construction permits: Quality control during. Statizoid. Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/korea-rep/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/korea-rep/west-bank-and-gaza/">Republic of Korea vs Palestine, State of: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.