Kosovo vs Russian Federation: Dealing with construction permits: Quality control during
Dealing with construction permits: Quality control during over time
- Kosovo
- Russian Federation
How they compare
Russian Federation currently reports 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo, a difference of 1 DB16-20 methodology.
That makes Russian Federation's figure about 1.5 times Kosovo's.
Across all 6 years both countries report, Russian Federation has been ahead every year.
Kosovo ranks 20th and Russian Federation ranks 1st of 186 countries.
Russian Federation has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Kosovo or Russian Federation?
- Russian Federation, at 3 DB16-20 methodology against 2 DB16-20 methodology in Kosovo as of 2019.
- What is the difference in dealing with construction permits: quality control during between Kosovo and Russian Federation?
- 1 DB16-20 methodology, with Russian Federation ahead.
- How many years of comparable data are there for Kosovo and Russian Federation?
- 6 years are reported by both, from 2014 to 2019.
- How do Kosovo and Russian Federation rank globally for dealing with construction permits: quality control during?
- Kosovo ranks 20th and Russian Federation ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.