Kuwait vs Laos: Dealing with construction permits: Quality control during

Kuwait
2 DB16-20 methodology
in 2019
Laos
2 DB16-20 methodology
in 2019
Kuwait rank
20th
Laos rank
20th

Dealing with construction permits: Quality control during over time

  • Kuwait
  • Laos
00.511.52201420162019

How they compare

Kuwait currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Laos, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Laos has been ahead every year.

Kuwait ranks 20th and Laos ranks 20th of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Kuwait or Laos?
Kuwait, at 2 DB16-20 methodology against 2 DB16-20 methodology in Laos as of 2019.
What is the difference in dealing with construction permits: quality control during between Kuwait and Laos?
0 DB16-20 methodology, with Kuwait ahead.
How many years of comparable data are there for Kuwait and Laos?
6 years are reported by both, from 2014 to 2019.
How do Kuwait and Laos rank globally for dealing with construction permits: quality control during?
Kuwait ranks 20th and Laos ranks 20th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kuwait vs Laos: Dealing with construction permits: Quality control during. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/kuwait/lao-pdr/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/kuwait/lao-pdr/">Kuwait vs Laos: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.