Kuwait vs Tonga: Dealing with construction permits: Quality control during construction
Kuwait
2 DB16-20 methodology
in 2019
Tonga
2 DB16-20 methodology
in 2019
Kuwait rank
19th
Tonga rank
19th
Dealing with construction permits: Quality control during construction over time
- Kuwait
- Tonga
How they compare
Kuwait currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tonga has been ahead every year.
Kuwait ranks 19th and Tonga ranks 19th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Kuwait or Tonga?
- Kuwait, at 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Kuwait and Tonga?
- 0 DB16-20 methodology, with Kuwait ahead.
- How many years of comparable data are there for Kuwait and Tonga?
- 6 years are reported by both, from 2014 to 2019.
- How do Kuwait and Tonga rank globally for dealing with construction permits: quality control during construction?
- Kuwait ranks 19th and Tonga ranks 19th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.