Lao People’s Democratic Republic vs Spain: Dealing with construction permits: Quality control during
Lao People’s Democratic Republic
2 DB16-20 methodology
in 2019
Spain
2 DB16-20 methodology
in 2019
Lao People’s Democratic Republic rank
20th
Spain rank
20th
Dealing with construction permits: Quality control during over time
- Lao People’s Democratic Republic
- Spain
How they compare
Lao People’s Democratic Republic currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Spain, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Spain has been ahead every year.
Lao People’s Democratic Republic ranks 20th and Spain ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Lao People’s Democratic Republic or Spain?
- Lao People’s Democratic Republic, at 2 DB16-20 methodology against 2 DB16-20 methodology in Spain as of 2019.
- What is the difference in dealing with construction permits: quality control during between Lao People’s Democratic Republic and Spain?
- 0 DB16-20 methodology, with Lao People’s Democratic Republic ahead.
- How many years of comparable data are there for Lao People’s Democratic Republic and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Lao People’s Democratic Republic and Spain rank globally for dealing with construction permits: quality control during?
- Lao People’s Democratic Republic ranks 20th and Spain ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.