Lesotho vs Samoa: Dealing with construction permits: Quality control during construction
Lesotho
0 DB16-20 methodology
in 2019
Samoa
0 DB16-20 methodology
in 2019
Lesotho rank
157th
Samoa rank
157th
Dealing with construction permits: Quality control during construction over time
- Lesotho
- Samoa
How they compare
Lesotho currently reports 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Samoa has been ahead every year.
Lesotho ranks 157th and Samoa ranks 157th of 183 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Lesotho or Samoa?
- Lesotho, at 0 DB16-20 methodology against 0 DB16-20 methodology in Samoa as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Lesotho and Samoa?
- 0 DB16-20 methodology, with Lesotho ahead.
- How many years of comparable data are there for Lesotho and Samoa?
- 6 years are reported by both, from 2014 to 2019.
- How do Lesotho and Samoa rank globally for dealing with construction permits: quality control during construction?
- Lesotho ranks 157th and Samoa ranks 157th of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.