Maldives vs Tonga: Dealing with construction permits: Quality control during
Maldives
2 DB16-20 methodology
in 2019
Tonga
2 DB16-20 methodology
in 2019
Maldives rank
20th
Tonga rank
20th
Dealing with construction permits: Quality control during over time
- Maldives
- Tonga
How they compare
Maldives currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tonga has been ahead every year.
Maldives ranks 20th and Tonga ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Maldives or Tonga?
- Maldives, at 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga as of 2019.
- What is the difference in dealing with construction permits: quality control during between Maldives and Tonga?
- 0 DB16-20 methodology, with Maldives ahead.
- How many years of comparable data are there for Maldives and Tonga?
- 6 years are reported by both, from 2014 to 2019.
- How do Maldives and Tonga rank globally for dealing with construction permits: quality control during?
- Maldives ranks 20th and Tonga ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.