Malta vs Sudan: Dealing with construction permits: Quality control during construction
Malta
2 DB16-20 methodology
in 2019
Sudan
2 DB16-20 methodology
in 2019
Malta rank
20th
Sudan rank
20th
Dealing with construction permits: Quality control during construction over time
- Malta
- Sudan
How they compare
Malta currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Sudan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Sudan has been ahead every year.
Malta ranks 20th and Sudan ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during construction, Malta or Sudan?
- Malta, at 2 DB16-20 methodology against 2 DB16-20 methodology in Sudan as of 2019.
- What is the difference in dealing with construction permits: quality control during construction between Malta and Sudan?
- 0 DB16-20 methodology, with Malta ahead.
- How many years of comparable data are there for Malta and Sudan?
- 6 years are reported by both, from 2014 to 2019.
- How do Malta and Sudan rank globally for dealing with construction permits: quality control during construction?
- Malta ranks 20th and Sudan ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.