Mexico vs Poland: Dealing with construction permits: Quality control during
Mexico
2 DB16-20 methodology
in 2019
Poland
2 DB16-20 methodology
in 2019
Mexico rank
20th
Poland rank
20th
Dealing with construction permits: Quality control during over time
- Mexico
- Poland
How they compare
Mexico currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Poland, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Poland has been ahead every year.
Mexico ranks 20th and Poland ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Mexico or Poland?
- Mexico, at 2 DB16-20 methodology against 2 DB16-20 methodology in Poland as of 2019.
- What is the difference in dealing with construction permits: quality control during between Mexico and Poland?
- 0 DB16-20 methodology, with Mexico ahead.
- How many years of comparable data are there for Mexico and Poland?
- 6 years are reported by both, from 2014 to 2019.
- How do Mexico and Poland rank globally for dealing with construction permits: quality control during?
- Mexico ranks 20th and Poland ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.