Mongolia vs Namibia: Dealing with construction permits: Quality control during construction

Mongolia
2 DB16-20 methodology
in 2019
Namibia
2 DB16-20 methodology
in 2019
Mongolia rank
19th
Namibia rank
19th

Dealing with construction permits: Quality control during construction over time

  • Mongolia
  • Namibia
00.511.52201420162019

How they compare

Mongolia currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Namibia, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Namibia has been ahead every year.

Mongolia ranks 19th and Namibia ranks 19th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during construction, Mongolia or Namibia?
Mongolia, at 2 DB16-20 methodology against 2 DB16-20 methodology in Namibia as of 2019.
What is the difference in dealing with construction permits: quality control during construction between Mongolia and Namibia?
0 DB16-20 methodology, with Mongolia ahead.
How many years of comparable data are there for Mongolia and Namibia?
6 years are reported by both, from 2014 to 2019.
How do Mongolia and Namibia rank globally for dealing with construction permits: quality control during construction?
Mongolia ranks 19th and Namibia ranks 19th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.