Namibia vs Saudi Arabia: Dealing with construction permits: Quality control during
Namibia
2 DB16-20 methodology
in 2019
Saudi Arabia
2 DB16-20 methodology
in 2019
Namibia rank
20th
Saudi Arabia rank
20th
Dealing with construction permits: Quality control during over time
- Namibia
- Saudi Arabia
How they compare
Namibia currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Saudi Arabia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saudi Arabia has been ahead every year.
Namibia ranks 20th and Saudi Arabia ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Namibia or Saudi Arabia?
- Namibia, at 2 DB16-20 methodology against 2 DB16-20 methodology in Saudi Arabia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Namibia and Saudi Arabia?
- 0 DB16-20 methodology, with Namibia ahead.
- How many years of comparable data are there for Namibia and Saudi Arabia?
- 6 years are reported by both, from 2014 to 2019.
- How do Namibia and Saudi Arabia rank globally for dealing with construction permits: quality control during?
- Namibia ranks 20th and Saudi Arabia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.