Nigeria vs Taïwan: Dealing with construction permits: Quality control during
Nigeria
2 DB16-20 methodology
in 2019
Taïwan
2 DB16-20 methodology
in 2019
Nigeria rank
20th
Taïwan rank
20th
Dealing with construction permits: Quality control during over time
- Nigeria
- Taïwan
How they compare
Nigeria currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Taïwan, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Taïwan has been ahead every year.
Nigeria ranks 20th and Taïwan ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Nigeria or Taïwan?
- Nigeria, at 2 DB16-20 methodology against 2 DB16-20 methodology in Taïwan as of 2019.
- What is the difference in dealing with construction permits: quality control during between Nigeria and Taïwan?
- 0 DB16-20 methodology, with Nigeria ahead.
- How many years of comparable data are there for Nigeria and Taïwan?
- 6 years are reported by both, from 2014 to 2019.
- How do Nigeria and Taïwan rank globally for dealing with construction permits: quality control during?
- Nigeria ranks 20th and Taïwan ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.