Philippines vs Slovakia: Dealing with construction permits: Quality control during
Philippines
2 DB16-20 methodology
in 2019
Slovakia
2 DB16-20 methodology
in 2019
Philippines rank
20th
Slovakia rank
20th
Dealing with construction permits: Quality control during over time
- Philippines
- Slovakia
How they compare
Philippines currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Slovakia has been ahead every year.
Philippines ranks 20th and Slovakia ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Philippines or Slovakia?
- Philippines, at 2 DB16-20 methodology against 2 DB16-20 methodology in Slovakia as of 2019.
- What is the difference in dealing with construction permits: quality control during between Philippines and Slovakia?
- 0 DB16-20 methodology, with Philippines ahead.
- How many years of comparable data are there for Philippines and Slovakia?
- 6 years are reported by both, from 2014 to 2019.
- How do Philippines and Slovakia rank globally for dealing with construction permits: quality control during?
- Philippines ranks 20th and Slovakia ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.