Poland, Republic of vs Romania: Dealing with construction permits: Quality control during
Poland, Republic of
2 DB16-20 methodology
in 2019
Romania
2 DB16-20 methodology
in 2019
Poland, Republic of rank
20th
Romania rank
20th
Dealing with construction permits: Quality control during over time
- Poland, Republic of
- Romania
How they compare
Poland, Republic of currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Romania, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Romania has been ahead every year.
Poland, Republic of ranks 20th and Romania ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Poland, Republic of or Romania?
- Poland, Republic of, at 2 DB16-20 methodology against 2 DB16-20 methodology in Romania as of 2019.
- What is the difference in dealing with construction permits: quality control during between Poland, Republic of and Romania?
- 0 DB16-20 methodology, with Poland, Republic of ahead.
- How many years of comparable data are there for Poland, Republic of and Romania?
- 6 years are reported by both, from 2014 to 2019.
- How do Poland, Republic of and Romania rank globally for dealing with construction permits: quality control during?
- Poland, Republic of ranks 20th and Romania ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.