San Marino vs Saint Lucia: Dealing with construction permits: Quality control during
San Marino
2 DB16-20 methodology
in 2019
Saint Lucia
2 DB16-20 methodology
in 2019
San Marino rank
20th
Saint Lucia rank
20th
Dealing with construction permits: Quality control during over time
- San Marino
- Saint Lucia
How they compare
San Marino currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Saint Lucia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Saint Lucia has been ahead every year.
San Marino ranks 20th and Saint Lucia ranks 20th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, San Marino or Saint Lucia?
- San Marino, at 2 DB16-20 methodology against 2 DB16-20 methodology in Saint Lucia as of 2019.
- What is the difference in dealing with construction permits: quality control during between San Marino and Saint Lucia?
- 0 DB16-20 methodology, with San Marino ahead.
- How many years of comparable data are there for San Marino and Saint Lucia?
- 6 years are reported by both, from 2014 to 2019.
- How do San Marino and Saint Lucia rank globally for dealing with construction permits: quality control during?
- San Marino ranks 20th and Saint Lucia ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.