Sao Tome and Principe vs Tonga: Dealing with construction permits: Quality control during
Sao Tome and Principe
2 DB16-20 methodology
in 2019
Tonga
2 DB16-20 methodology
in 2019
Sao Tome and Principe rank
20th
Tonga rank
20th
Dealing with construction permits: Quality control during over time
- Sao Tome and Principe
- Tonga
How they compare
Sao Tome and Principe currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Tonga has been ahead every year.
Sao Tome and Principe ranks 20th and Tonga ranks 20th of 186 countries.
Tonga has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Sao Tome and Principe or Tonga?
- Sao Tome and Principe, at 2 DB16-20 methodology against 2 DB16-20 methodology in Tonga as of 2019.
- What is the difference in dealing with construction permits: quality control during between Sao Tome and Principe and Tonga?
- 0 DB16-20 methodology, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Sao Tome and Principe and Tonga?
- 6 years are reported by both, from 2014 to 2019.
- How do Sao Tome and Principe and Tonga rank globally for dealing with construction permits: quality control during?
- Sao Tome and Principe ranks 20th and Tonga ranks 20th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.