Seychelles vs Trinidad and Tobago: Dealing with construction permits: Quality control during

Seychelles
1 DB16-20 methodology
in 2019
Trinidad and Tobago
1 DB16-20 methodology
in 2019
Seychelles rank
139th
Trinidad and Tobago rank
139th

Dealing with construction permits: Quality control during over time

  • Seychelles
  • Trinidad and Tobago
00.20.40.60.81201420162019

How they compare

Seychelles currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Trinidad and Tobago, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Trinidad and Tobago has been ahead every year.

Seychelles ranks 139th and Trinidad and Tobago ranks 139th of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Seychelles or Trinidad and Tobago?
Seychelles, at 1 DB16-20 methodology against 1 DB16-20 methodology in Trinidad and Tobago as of 2019.
What is the difference in dealing with construction permits: quality control during between Seychelles and Trinidad and Tobago?
0 DB16-20 methodology, with Seychelles ahead.
How many years of comparable data are there for Seychelles and Trinidad and Tobago?
6 years are reported by both, from 2014 to 2019.
How do Seychelles and Trinidad and Tobago rank globally for dealing with construction permits: quality control during?
Seychelles ranks 139th and Trinidad and Tobago ranks 139th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Seychelles vs Trinidad and Tobago: Dealing with construction permits: Quality control during. Statizoid. Retrieved 28 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/seychelles/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/seychelles/trinidad-and-tobago/">Seychelles vs Trinidad and Tobago: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.