Solomon Islands vs Togo: Dealing with construction permits: Quality control during

Solomon Islands
1 DB16-20 methodology
in 2019
Togo
1 DB16-20 methodology
in 2019
Solomon Islands rank
138th
Togo rank
138th

Dealing with construction permits: Quality control during over time

  • Solomon Islands
  • Togo
00.20.40.60.81201420162019

How they compare

Solomon Islands currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Togo, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Solomon Islands ahead.

Solomon Islands ranks 138th and Togo ranks 138th of 185 countries.

Solomon Islands has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: quality control during, Solomon Islands or Togo?
Solomon Islands, at 1 DB16-20 methodology against 1 DB16-20 methodology in Togo as of 2019.
What is the difference in dealing with construction permits: quality control during between Solomon Islands and Togo?
0 DB16-20 methodology, with Solomon Islands ahead.
How many years of comparable data are there for Solomon Islands and Togo?
6 years are reported by both, from 2014 to 2019.
How do Solomon Islands and Togo rank globally for dealing with construction permits: quality control during?
Solomon Islands ranks 138th and Togo ranks 138th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Solomon Islands vs Togo: Dealing with construction permits: Quality control during. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/solomon-islands/togo/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-quality-control-during-construction-index-0-3-db16-20/solomon-islands/togo/">Solomon Islands vs Togo: Dealing with construction permits: Quality control during</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.