South Sudan vs Zambia: Dealing with construction permits: Quality control during
South Sudan
1 DB16-20 methodology
in 2019
Zambia
1 DB16-20 methodology
in 2019
South Sudan rank
139th
Zambia rank
139th
Dealing with construction permits: Quality control during over time
- South Sudan
- Zambia
How they compare
South Sudan currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Zambia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Zambia has been ahead every year.
South Sudan ranks 139th and Zambia ranks 139th of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, South Sudan or Zambia?
- South Sudan, at 1 DB16-20 methodology against 1 DB16-20 methodology in Zambia as of 2019.
- What is the difference in dealing with construction permits: quality control during between South Sudan and Zambia?
- 0 DB16-20 methodology, with South Sudan ahead.
- How many years of comparable data are there for South Sudan and Zambia?
- 6 years are reported by both, from 2014 to 2019.
- How do South Sudan and Zambia rank globally for dealing with construction permits: quality control during?
- South Sudan ranks 139th and Zambia ranks 139th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.