Tunisia vs Venezuela, Bolivarian Republic of: Dealing with construction permits: Quality control during
Tunisia
2 DB16-20 methodology
in 2019
Venezuela, Bolivarian Republic of
2 DB16-20 methodology
in 2019
Tunisia rank
20th
Venezuela, Bolivarian Republic of rank
20th
Dealing with construction permits: Quality control during over time
- Tunisia
- Venezuela, Bolivarian Republic of
How they compare
Tunisia currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Venezuela, Bolivarian Republic of, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Venezuela, Bolivarian Republic of has been ahead every year.
Tunisia ranks 20th and Venezuela, Bolivarian Republic of ranks 20th of 185 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality control during, Tunisia or Venezuela, Bolivarian Republic of?
- Tunisia, at 2 DB16-20 methodology against 2 DB16-20 methodology in Venezuela, Bolivarian Republic of as of 2019.
- What is the difference in dealing with construction permits: quality control during between Tunisia and Venezuela, Bolivarian Republic of?
- 0 DB16-20 methodology, with Tunisia ahead.
- How many years of comparable data are there for Tunisia and Venezuela, Bolivarian Republic of?
- 6 years are reported by both, from 2014 to 2019.
- How do Tunisia and Venezuela, Bolivarian Republic of rank globally for dealing with construction permits: quality control during?
- Tunisia ranks 20th and Venezuela, Bolivarian Republic of ranks 20th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality control during construction index (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality control during construction index evaluates quality control during the construction process. It has two components: (i) whether inspections are mandated by law during the construction process; (ii) whether inspections during construction are implemented in practice. The index is computed based on the methodology in the DB16-20 studies.