Democratic Republic of Congo vs Malta: Dealing with construction permits: Quality of building regulations
Democratic Republic of Congo
2 DB16-20 methodology
in 2019
Malta
2 DB16-20 methodology
in 2019
Democratic Republic of Congo rank
1st
Malta rank
1st
Dealing with construction permits: Quality of building regulations over time
- Democratic Republic of Congo
- Malta
How they compare
Democratic Republic of Congo currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Malta, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Malta has been ahead every year.
Democratic Republic of Congo ranks 1st and Malta ranks 1st of 186 countries.
Malta has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Democratic Republic of Congo or Malta?
- Democratic Republic of Congo, at 2 DB16-20 methodology against 2 DB16-20 methodology in Malta as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Democratic Republic of Congo and Malta?
- 0 DB16-20 methodology, with Democratic Republic of Congo ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Malta?
- 6 years are reported by both, from 2014 to 2019.
- How do Democratic Republic of Congo and Malta rank globally for dealing with construction permits: quality of building regulations?
- Democratic Republic of Congo ranks 1st and Malta ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.